How to Size a UPS for a NAS and Homelab (VA, Watts, Runtime)
Add up your NAS and homelab load in watts and VA, then use a manufacturer’s runtime chart to find a UPS that gives your gear time to shut down.
Size a UPS for your NAS and homelab by adding up the watts and VA of everything that needs battery power. Choose a UPS that covers both totals, then look up how long that exact model can run at your load in watts. Allow enough time for the equipment to finish shutting down. CyberPower CP1000PFCLCDa specifications · Example Eaton runtime chart · Network UPS Tools configuration notes
List the equipment that needs battery power
Start with the NAS and any hosts you need to keep running or shut down cleanly. For network-controlled shutdown, include the network gear your shutdown plan depends on. Network UPS Tools configuration notes
Add up watts and VA separately
Record each device’s input watts and VA. P3 P4400 specifications
This example uses hypothetical loads.
| Battery-backed device | Watts | VA |
|---|---|---|
| NAS | 80 W | 100 VA |
| Homelab host | 190 W | 240 VA |
| Network switch | 30 W | 40 VA |
| Total | 300 W | 380 VA |
Screen each candidate against the two columns independently. In this example, it must support at least 300 W and 380 VA. Add any equipment you already plan to put on the battery outlets before doing this calculation. CyberPower CP1000PFCLCDa specifications
Set the runtime you need
For a clean shutdown, budget for any delay before shutdown starts and the time for all protected systems to finish. For example, a planned wait of 2 minutes, 3 minutes to shut everything down, and a 3-minute reserve give an 8-minute runtime target. Network UPS Tools configuration notes
Use the total watts you expect during that window. To estimate runtime for a specific workload, you can take readings under that workload with a plug-in meter that displays watts, such as the P3 P4400, and add the readings for the devices on battery. P3 P4400 specifications
Read the runtime at your load
Open the manufacturer’s runtime chart for the exact model. Find your load on the watts axis and read the corresponding time in minutes. On Eaton’s example chart, hover over the graph to see detailed values. Compare the resulting time with your runtime target. Example Eaton runtime chart
Suppose the example setup draws 300 W during the outage. CyberPower rates its CP1000PFCLCDa at 1,000 VA and 600 W, with 6 minutes of runtime at half load. It passes the capacity screen. CyberPower CP1000PFCLCDa specifications
Check battery outlets and shutdown support
Check that every device on your list has a battery-backed outlet. For example, the CP1000PFCLCDa lists 10 outlets, of which 5 provide battery backup. CyberPower CP1000PFCLCDa specifications
For a NAS or server that uses Network UPS Tools (NUT), look up the exact UPS model and connection type in its compatibility list, then use the configuration guide for automatic shutdown. NUT hardware compatibility list · Network UPS Tools configuration notes
Evidence and limits. Eaton’s example runtime chart, the P3 P4400 and CyberPower CP1000PFCLCDa specifications, and the NUT 2.8.5 documentation were checked on November 26, 2026. The procedure was not run. CyberPower’s runtime estimate is based on new, fully charged batteries under normal operating conditions. Actual runtime can vary with battery age, charge and environment. CyberPower CP1000PFCLCDa specifications
Visit the Homelab UPS overview or browse the guide index.